The questions cover every section of chapter 8:

  • 8.1 Doing work and calculating work done
  • 8.2
  • 8.3 Power and calculating power

Each question shows where it is from (session, paper and question number, or the book), the section it tests, and whether it is Core (Paper 1/3) or Extended (Paper 2/4). Choose an answer for each question, tap Check my answers to mark that part, then Show solutions to see the working. Your best score is saved on this device.

APart A 9 questions

Questions 1–9.

1
CorePast paper · May/June 2025 · Paper 12 · Q88.1 Doing work and calculating work donealso asked in 1 other paper

Work done W depends on the size F of a force and the distance d moved in the direction of the force. Which equation is correct?

✔ AnswerD   W = F × d
FormulaW = Fdwork done = force × distance moved in the direction of the force
From the examiner reportMost candidates recalled W = Fd.
2
CorePast paper · Feb/March 2024 · Paper 12 · Q68.1 Doing work and calculating work done

Three situations: 1 – blowing air into a party balloon; 2 – a crane lifting a concrete block; 3 – a pile of books resting on a shelf. In which is work being done?

✔ AnswerB   1 and 2 only

Work is done when a force moves something in its direction. Blowing up a balloon pushes the air and stretches the rubber (work done); the crane lifts the block (work done). The books are at rest: a force acts but nothing moves, so no work is done.

3
CorePast paper · Oct/Nov 2024 · Paper 12 · Q88.1 Doing work and calculating work done

A builder lifts a concrete block weighing 170 N from the ground onto a platform 2.1 m above the ground (the stack of blocks is 2.6 m tall). What useful work is done against gravity on the block?

✔ AnswerA   360 J
FormulaW = Fdwork done = force × distance moved
  1. StepW = 170 × 2.1 = 357 ≈ 360 J
Common mistakeWork is in joules, not watts (C, D).
From the examiner reportMany found 360 but chose the watt as the unit of work (C).
4
CorePast paper · May/June 2023 · Paper 12 · Q118.1 Doing work and calculating work done

A moving object is brought to rest by a resistive force of 50 N acting over a distance of 5.0 m. How much work does the force do?

✔ AnswerD   250 J
FormulaW = Fd
  1. Step50 × 5.0 = 250 J
Common mistake10 J divides instead of multiplying.
5
CorePast paper · Oct/Nov 2022 · Paper 12 · Q108.1 Doing work and calculating work donealso asked in 1 other paper

A mass is lifted from rest on the ground to a point Y, with no air resistance. P is the increase in its gravitational potential energy and Q is its kinetic energy at Y. Which expression equals the mechanical work done on the mass?

✔ AnswerA   P + Q

With no air resistance, all the work done goes into energy stores: the gain in gravitational potential energy (P) plus the kinetic energy at Y (Q). Work done = P + Q.

Common mistakeP × Q would have the unit J², not J.
From the examiner reportD (P × Q) was by far the most popular, but multiplying two energies gives J², not J. Work done = P + Q.
6
CorePast paper · May/June 2021 · Paper 11 · Q118.1 Doing work and calculating work donealso asked in 2 other papers

Man X pushes heavy box P along the floor, but it does not move because something is blocking it. Man Y lifts an identical box Q from the floor onto a shelf. Who does more work on his box, and which box gains more energy?

✔ AnswerD   Y; Q
Formulawork done = F × d

Box P does not move, so man X does no work and P gains no energy. Man Y moves Q upwards, doing work that becomes gravitational potential energy of Q.

From the examiner reportWork needs movement in the direction of the force: box P does not move.
7
CoreBook practice · Marshall Cavendish IGCSE Physics (Let’s Review), Ch 68.1 Doing work and calculating work done

A horizontal force of 6.0 N pushes a 4.0 kg trolley 3.0 m in the direction of the force. How much work does the force do?

✔ AnswerC   18 J
FormulaW = F d
  1. StepW = 6.0 × 3.0 = 18 J

The mass is not needed: work depends only on the force and the distance moved in its direction.

8
CorePast paper · Feb/March 2025 · Paper 12 · Q118.3 Power and calculating power

A boy cycling for 2.0 minutes has an average useful power output of 60 W. How much useful energy does he transfer?

✔ AnswerD   7200 J
FormulaE = Ptenergy = power × time (time in SECONDS)
  1. Stept = 2.0 × 60 = 120 s
  2. StepE = 60 × 120 = 7200 J
Common mistake60 × 2.0 = 120 J (C) forgets to change minutes to seconds; 60 ÷ 2.0 = 30 J (B) also uses the wrong equation.
From the examiner reportChallenging: C was common because 2.0 minutes was not changed into seconds; B came from not using energy = power × time as well.
9
CorePast paper · May/June 2024 · Paper 13 · Q78.3 Power and calculating power

Four electric motors each lift a 10 N weight through the same height, so they do the same work. Their times are 1.5 s, 6.0 s, 15 s and 60 s. Which time belongs to the most powerful motor?

✔ AnswerA   1.5 s
FormulaP = W ÷ tpower = work done ÷ time

Same work done, so the most powerful motor does it in the shortest time: 1.5 s.

BPart B 8 questions

Questions 10–17.

10
CorePast paper · May/June 2023 · Paper 11 · Q128.3 Power and calculating poweralso asked in 1 other paper

A child runs up the same set of stairs four times, and each run is timed. For which time is the child’s useful power greatest?

✔ AnswerA   10 s
FormulaP = W ÷ t

The work done (lifting her weight up the same stairs) is the same every time. Power is work done per second, so the shortest time, 10 s, gives the greatest power.

From the examiner reportMost linked the greatest power with doing the work in the shortest time.
11
CorePast paper · Oct/Nov 2023 · Paper 12 · Q108.3 Power and calculating poweralso asked in 1 other paper

An electric car is charged overnight: 180 MJ is transferred in 8.0 hours. What is the power of the charger?

✔ AnswerA   6.3 kW
FormulaP = E ÷ t
  1. Stept = 8.0 × 3600 = 28 800 s
  2. StepP = 180 000 000 ÷ 28 800 = 6250 W ≈ 6.3 kW
Common mistake23 MW divides by 8 (hours) instead of 28 800 s.
From the examiner reportC was the most popular wrong answer: the time was not converted into seconds.
12
CorePast paper · Feb/March 2021 · Paper 12 · Q118.3 Power and calculating power

Four machines: A does 100 kJ in 10 s; B 100 kJ in 20 s; C 200 kJ in 10 s; D 200 kJ in 20 s. Which is the most powerful?

✔ AnswerC   C
Formulapower = work done ÷ time
  1. A10 kW; B: 5 kW; C: 200 ÷ 10 = 20 kW; D: 10 kW
13
CorePast paper · Oct/Nov 2021 · Paper 13 · Q98.3 Power and calculating power

One person lifts a book from the floor onto a shelf. It falls off and a second person lifts it back onto the same shelf. Which statement must be correct?

✔ AnswerA   same work done
Formulawork done = weight × height

The same book is raised through the same height, so the work done is the same. Nothing tells us how quickly each person lifts it, so time and power could differ.

14
ExtendedPast paper · Oct/Nov 2024 · Paper 21 · Q98.1 Doing work and calculating work done

An object of mass m is launched with speed v from point P and lands at point Q on top of a cliff of height h. It does work W against air resistance on the way. What is its kinetic energy at Q?

✔ AnswerD   ½mv² − mgh − W
  1. Stepstart with ½mv²
  2. Some becomes GPEsubtract mgh
  3. Stepsome is wasted against air resistance: subtract W
15
ExtendedPast paper · Oct/Nov 2022 · Paper 23 · Q98.1 Doing work and calculating work done

A skier is pulled at constant speed up a straight slope 10 m long by a rope, rising 1.5 m vertically. The tension in the rope is 100 N, and friction plus air resistance total 20 N. How much work does the rope do?

✔ AnswerC   1000 J
FormulaW = F × dforce × distance moved in the direction of the force
  1. Stepthe rope pulls with 100 N along the slope for 10 m
  2. StepW = 100 × 10 = 1000 J
Common mistake150 J uses the vertical rise; 1200 J adds the friction force to the tension.
From the examiner reportMany did not see this was simply work = force × distance moved along the slope: 100 N × 10 m.
16
ExtendedPast paper · May/June 2022 · Paper 22 · Q128.3 Power and calculating power

A boy weighing 500 N pulls himself up a bar, raising himself 40 cm in 0.5 s. What average power does he produce?

✔ AnswerB   400 W
FormulaP = W ÷ t = Fd ÷ t
  1. Stepwork = 500 × 0.40 = 200 J
  2. StepP = 200 ÷ 0.5 = 400 W
Common mistake40 000 W uses 40 cm without converting to metres.
From the examiner reportWrong answers came from not changing 40 cm to 0.40 m, or from wrongly multiplying or dividing by g. The weight is already in newtons.
17
ExtendedPast paper · Oct/Nov 2021 · Paper 21 · Q98.3 Power and calculating power

A motor of power P exerts a force F on an object, which moves a distance d in the time t the force acts. Which equation gives t?

✔ AnswerB   t = Fd ÷ P
  1. Stepwork done = Fd
  2. StepP = Fd ÷ t
  3. Stepso t = Fd ÷ P

Your overall result

Check every section above to fill this in. Your best attempt is remembered on this device.

Answer and check at least one section to see your score here.
100% free

Everything on K2 Physics is free

3D labs, notes for every chapter, IGCSE past paper solutions and quizzes. No sign-up, no payment, no access codes.

Want a teacher as well? Live classes start with a free demo class. Book a demo class →